EXPLORE PROJECTS
Real Results from Complex Survey Challenges
Parry Sound Island Survey
ResidentialSurveyTopographic SurveysThe project required accurate topographic data collection across a remote island property with limited site access while capturing detailed terrain, shoreline features, structures, and natural landscape elements.IBW Surveyors...
Topographic Survey – Highway 407ETR
Infrastructure ConstructionSurveyTopographic SurveysThe project required accurate data collection of bridge structures, surrounding infrastructure, and active rail corridors while working within restricted access conditions, limited closure windows, and a demanding...
OLS CONSULTATION
ResidentialSurveyLot Line StakingThe main question was whether the existing fence followed the legal property boundary. Since the fence had been there for many years, its location alone could not answer that question.IBW reviewed historical survey plans, property...
Heritage Building Survey & As-Built Documentation
CommercialDrone & LiDARTopographic SurveysThe client required detailed documentation of the existing heritage building, including interior layouts, exterior façades, architectural features, and surrounding site conditions to support future renovation and design...
City of Brockville – Culvert Drainage Design Survey
IBW completed topographic surveys at three Brockville culvert crossings to support hydraulic modeling and municipal drainage infrastructure design.
Visual Condition Assessment for Gabion Wall
IBW used terrestrial LiDAR to assess a gabion retaining wall along Taylor Massey Creek in Toronto, delivering a 3D dataset for engineering review.
Plan of Survey Showing Topography for Tribute Communities Centre
IBW completed a Plan of Survey with topography for the Tribute Communities Centre in Oshawa, supporting City planning with combined legal and topographic data.
Cement Production Plant Infrastructure Survey
IBW provided precision construction layout for Canada’s first commercial carbon capture facility at Ash Grove Cement in Mississauga. High-accuracy embedment surveys.
9km Topographic Road Survey for the Palermo TS Upgrade
IBW delivered 9km topographic survey for Hydro One transmission line upgrade in Milton using hybrid drone LiDAR and ground surveying methodology.
Egan Avenue Building Settlement Monitoring
IBW protected residential properties from pile driving vibration during Ontario Line construction. Daily settlement monitoring ensured zero structural damage.
Ontario Line First Order Control
Multiple Ontario Line contracts create risks of coordinate misalignment at interface points. Metrolinx required a high-accuracy control network for the Lakeshore East Joint Corridor to ensure consistency and reliable project alignment.
Ontario Line Bridge Substructure Monitoring
IBW provided 24-month manual bridge monitoring for Ontario Line construction in Toronto. Daily crack gauge and precision surveys protected critical infrastructure.
START YOUR PROJECT
Turn Your Vision Into Reality
Whether you’re a homeowner or developer, we’re ready to help with your next project.









