EXPLORE PROJECTS
Real Results from Complex Survey Challenges
Cement Production Plant Infrastructure Survey
IBW provided precision construction layout for Canada’s first commercial carbon capture facility at Ash Grove Cement in Mississauga. High-accuracy embedment surveys.
Ontario Line First Order Control
Multiple Ontario Line contracts create risks of coordinate misalignment at interface points. Metrolinx required a high-accuracy control network for the Lakeshore East Joint Corridor to ensure consistency and reliable project alignment.
Lakeshore East Joint Corridor – Construction Layout & As-Builts
IBW provided precision construction layout and GEDO trolley as-built surveys for Ontario Line rail expansion. Complete track geometry verification in Toronto.
HWY 400 and Finch Rapid Bridge Replacement
Expert survey and layout services for Highway 400 bridge replacement. IBW delivered millimeter-accurate guidance for pre-fabrication and real-time installation in Toronto.
Rivermede Condo Conversion
IBW Surveyors provided complete condo conversion survey services in Vaughan using SLAM technology for precise unit measurements and regulatory compliance.
Kitley Line 9 Bridge Replacement
IBW Surveyors provided comprehensive topographic surveys for bridge replacement pre-engineering in Elizabethtown-Kitley with detailed creek bed profiling.
City of Toronto Basement Flooding Survey for Pre-Engineering
Project Overview Massive Complex Linear Streetscape Topo Covered Approximately 48km Of Public Right of Ways High Standards Set of Deliverables Used for Pre-Engineering, Including Alignments, Traverse Adjustments, 2D & 3D CAD Files, DTM, Etc. Meet Extremely Tight...
Port Hope Area Initiative
Project Overview Identify All Visible Topographic Features 174 Property Surveys Identify the Existence of Right of Ways Re-Establish Boundaries of Portions of Municipal Roads and Right-of-Way Coordinate and Map Underground Utility Locate Port Hope Area Initiative...
East Rail Maintenance Facility Whitby – Construction Layout
Project Overview Layout of Centerline of Tracks, Ductbank, Overhead Catenary System, Poles, Etc. As-Built of Main Buildings Pre-Condition Topographic Survey Precise Control Network Project Cost: $859.2 Million Area: 500,00 Square Feet of Maintenance Building East Rail...
Toronto-York Spadina Subway Extension
Project Overview Layout of Centerline of Tracks Precise Horizontal and Vertical Control Network Verification Rigorous Technical Standards Use Of ½” Instrument Length: 8.6 Km Estimated Project Cost: $3.18 Billion Toronto-York Spadina Subway Extension If you have...
Ontario Place Pre-Engineering Survey
Project Overview Identify and Establish Complex Boundary Legal and Topographic Survey of Approximately 100 Acres Coordinate and Map Underground Utility Locate Meet Extremely Tight Deadlines Survey Approximately 100 Acres Ontario Place If you have a Vision We will help...
Wind Farm Survey for Pre-Engineering & Construction Layout
Project Overview Horizontal and Vertical Control Network Identify All Visible Topographic Features Prior To Design Topographic Survey Of 21 km of Roadway Layout of Turbines, Access Road, Public Roads, Cables, Etc. Surface Model & Contours Establish Boundary -...
START YOUR PROJECT
Turn Your Vision Into Reality
Whether you’re a homeowner or developer, we’re ready to help with your next project.











