EXPLORE PROJECTS
Real Results from Complex Survey Challenges
Cement Production Plant Infrastructure Survey
IBW provided precision construction layout for Canada’s first commercial carbon capture facility at Ash Grove Cement in Mississauga. High-accuracy embedment surveys.
9km Topographic Road Survey for the Palermo TS Upgrade
IBW delivered 9km topographic survey for Hydro One transmission line upgrade in Milton using hybrid drone LiDAR and ground surveying methodology.
Egan Avenue Building Settlement Monitoring
IBW protected residential properties from pile driving vibration during Ontario Line construction. Daily settlement monitoring ensured zero structural damage.
Ontario Line First Order Control
Multiple Ontario Line contracts create risks of coordinate misalignment at interface points. Metrolinx required a high-accuracy control network for the Lakeshore East Joint Corridor to ensure consistency and reliable project alignment.
Ontario Line Bridge Substructure Monitoring
IBW provided 24-month manual bridge monitoring for Ontario Line construction in Toronto. Daily crack gauge and precision surveys protected critical infrastructure.
Ontario Line Leslieville and Gerrard Station
Expert structural monitoring for Leslieville and Gerrard station excavations. IBW delivered 24/7 secant wall displacement tracking with custom alarm systems.
Lakeshore East Joint Corridor – Construction Layout & As-Builts
IBW provided precision construction layout and GEDO trolley as-built surveys for Ontario Line rail expansion. Complete track geometry verification in Toronto.
Lakeshore East Joint Corridor – Monitoring
IBW provided automated 24/7 monitoring for Ontario Line rail corridor construction in Toronto. 1,100+ sensors tracked with intelligent alarm systems.
Glynnwood Tributary Area Sewer Discharge
Expert pre-engineering surveys for municipal sewer infrastructure. IBW delivered integrated topographic and bathymetric data using advanced mobile mapping.
Seven Meadows Subdivision Storm Water Pond
IBW Surveyors provided bathymetric surveys for stormwater pond municipal transfer in Beaverton using USV technology and sediment depth analysis.
HWY 400 and Finch Rapid Bridge Replacement
Expert survey and layout services for Highway 400 bridge replacement. IBW delivered millimeter-accurate guidance for pre-fabrication and real-time installation in Toronto.
Rivermede Condo Conversion
IBW Surveyors provided complete condo conversion survey services in Vaughan using SLAM technology for precise unit measurements and regulatory compliance.
START YOUR PROJECT
Turn Your Vision Into Reality
Whether you’re a homeowner or developer, we’re ready to help with your next project.











