Cement Production Plant Infrastructure Survey

Category

The Challenge

First-of-its-kind commercial carbon capture facility required high-precision construction layout within active cement production plant with tight tolerances.

The Solution

IBW established robust site control network and executed precise layout of foundations, formwork, and structural elements throughout phased construction.

The Result

High-precision layout enabled successful structural completion of innovative clean technology infrastructure with all components positioned exactly as designed.

Project Summary

Construction Layout for Pioneering Carbon Capture Infrastructure

Mississauga, ON

IBW Surveyors provided comprehensive construction survey support for the Carbon 1 Mississauga facility at the Ash Grove Cement Company, representing one of Canada’s first commercial carbon capture and utilization plants and a significant milestone in industrial sustainability. This groundbreaking project required integrating cutting-edge clean technology infrastructure into an active industrial cement production environment, creating unique logistical and technical challenges that demanded exceptional precision and adaptability. The construction of this pioneering facility presented significant operational constraints including limited site access, ongoing plant operations that could not be disrupted, and extremely tight construction tolerances required for proper functioning of the specialized carbon capture process equipment. IBW’s mandate encompassed the full spectrum of construction layout tasks across a phased construction schedule, requiring our team to maintain consistent survey control and verification throughout the build while working in close collaboration with the contractor to adapt to the dynamic conditions of an operating industrial facility.

Cement Production Plant Infrastructure Survey
Cement Production Plant Infrastructure Survey
Cement Production Plant Infrastructure Survey
Technical Details

Phased Control Network Maintenance with Embedment Precision Layout

The technical execution of this project centered on maintaining high-precision geometry across various construction phases within the challenging active plant environment. IBW established and rigorously maintained a robust site survey control network that served as the project’s geometric backbone, ensuring consistency and accuracy throughout the phased construction sequence. From this stable control foundation, our team executed precise layout of concrete foundations and formwork to guide the pouring of critical structural elements, followed by detailed layout of anchor bolts and embedded items that were essential for subsequent installation of heavy machinery and specialized carbon capture process equipment. The complexity of these embedment layouts required meticulous attention to positioning accuracy, as any deviation from design specifications could compromise the alignment of the sophisticated equipment systems that would ultimately enable the facility’s carbon capture functionality. Throughout the structural erection process, IBW performed continuous column layout and verification work to monitor adherence to design tolerances, providing the construction team with immediate feedback that enabled proactive adjustments and ensured long-term structural integrity of this innovative clean technology infrastructure.

Cement Production Plant Infrastructure Survey
Equipment & Technology

Trimble High-Precision Total Station Network with Rigorous Verification Protocols

To meet the stringent tolerance requirements demanded by the process-related components of this carbon capture facility, IBW deployed high-precision surveying instrumentation specifically configured for industrial construction applications. The layout and verification operations utilized Trimble Robotic Total Stations equipped with High Precision (HP) 0.5″ angular accuracy capabilities, ensuring that all positioning tasks met the strict geometric demands of the facility’s engineering design specifications. Site control network establishment and elevation verification employed Trimble DiNi Digital Levels for precise vertical reference throughout the construction phases. All field observations and layout data were processed through Trimble Business Centre for comprehensive data management and quality control verification. This rigorous instrumentation approach and verification protocol enabled IBW’s survey services to be instrumental in the successful advancement and completion of major structural works, ensuring that all structural components including complex anchor bolts and embedded items were installed exactly as designed to support the long-term performance and integrity of Canada’s pioneering commercial carbon capture and utilization infrastructure.

Trimble Robotic Total Stations

Trimble Robotic Total Stations

Trimble DiNi Digital Level

Trimble DiNi Digital Level

AutoCAD® Civil 3D®

AutoCAD® Civil 3D®

Trimble Business Center

Trimble Business Center

MicroSurvey CAD

MicroSurvey CAD

Similar Projects

Similar Project Showcase

Ontario Line First Order Control

Ontario Line First Order Control

Multiple Ontario Line contracts create risks of coordinate misalignment at interface points. Metrolinx required a high-accuracy control network for the Lakeshore East Joint Corridor to ensure consistency and reliable project alignment.

read more
IBW Surveyors Icon
Advance Your Project

Turn Your Plans Into Reality

Need expert surveying solutions for your development?

Our team of licensed surveyors is ready to discuss your specifications and deliver the precise data and documentation your project demands.